Erigavo road 90km compeleted
Moderator: Moderators
- LeJusticier
- SomaliNet Super

- Posts: 8485
- Joined: Wed Jun 05, 2013 5:36 pm
- Location: base of sufism. Imam Le Justicier ...Xerta Dareenka
Erigavo road 90km compeleted
[youtube]Eyh6GQHU9rw#t=252[/youtube]
Re: Erigavo road 90km compeleted
90 already thats really good itll be done in just a few years. it thought it would take over a decade
Re: Erigavo road 90km compeleted
mashallah.
meanwhile in aidisho
meanwhile in aidisho
Re: Erigavo road 90km compeleted
So around 40% is already complete!


Re: Erigavo road 90km compeleted
The road is 380km I believe^^^not 200km.
Well done to the people of Somaliland
Well done to the people of Somaliland
- LeJusticier
- SomaliNet Super

- Posts: 8485
- Joined: Wed Jun 05, 2013 5:36 pm
- Location: base of sufism. Imam Le Justicier ...Xerta Dareenka
Re: Erigavo road 90km compeleted
387km.Xamud. wrote:The road is 380km I believe^^^not 200km.
Well done to the people of Somaliland
The only thing worries me is the quality of road work being done. Esp hadii roob badani da'o!!
Re: Erigavo road 90km compeleted
LJ no need to sweat over that at this stage. The first thing is first and that is intentions. If there is a will there is a way. Don't rush and become another LiquidHydrogen 
LH for instance expects Hargeisa to go from an ex-Ciidagale xeero geel to Viena of Africa over night.
Quality will be poor but it's better than nothing. Look when the first Chinese Emperor Chin began the great wall it was just sand compressed together. Then next one added bricks and so forth.
LH for instance expects Hargeisa to go from an ex-Ciidagale xeero geel to Viena of Africa over night.
Quality will be poor but it's better than nothing. Look when the first Chinese Emperor Chin began the great wall it was just sand compressed together. Then next one added bricks and so forth.
- LeJusticier
- SomaliNet Super

- Posts: 8485
- Joined: Wed Jun 05, 2013 5:36 pm
- Location: base of sufism. Imam Le Justicier ...Xerta Dareenka
Re: Erigavo road 90km compeleted
WaaliCas wrote:LJ no need to sweat over that at this stage. The first thing is first and that is intentions. If there is a will there is a way. Don't rush and become another LiquidHydrogen

Re: Erigavo road 90km compeleted
Yeah it depends on how the funds are managed, I have heard that it costs around 80-100k to build 1km of paved road, lacag badan ba la guray koley, ugu yaran 30 million USD ayaa ku baxayo, markas haadi aan jeebka la gashan lacagta the quality of the road will be sustainable.LeJusticier wrote:387km.Xamud. wrote:The road is 380km I believe^^^not 200km.
Well done to the people of Somaliland
The only thing worries me is the quality of road work being done. Esp hadii roob badani da'o!!
-
theyuusuf143
- SomaliNet Super

- Posts: 17692
- Joined: Sun May 01, 2011 1:15 pm
- Location: "Dareen naxli reeba iyo nolosha aan loo sinayn naftaaday dhaawacaan" by dhaglas
Re: Erigavo road 90km compeleted
ceerigaabo and ceelafweyn are completely linked now. next stage ina afmadobe and gar adag will be linked then ceelafweyn to gar adag. I am sure we can finish it in 2 years all together.
There is 2 huge road projects that needs to be done after this. burao via oodwyne to hargeisa. borama to saylac.
There is 2 huge road projects that needs to be done after this. burao via oodwyne to hargeisa. borama to saylac.
- Methylamine
- SomaliNet Super

- Posts: 6362
- Joined: Sat Jan 01, 2011 7:22 pm
Re: Erigavo road 90km compeleted
Masha'Allah, well done to those who contributed to this project
-
- Similar Topics
- Replies
- Views
- Last post
-
- 7 Replies
- 932 Views
-
Last post by JSL3000
-
- 0 Replies
- 1037 Views
-
Last post by Ducaysane_87
-
- 19 Replies
- 2190 Views
-
Last post by MrPrestige
-
- 22 Replies
- 136 Views
-
Last post by Cumar-Labasuul
-
- 3 Replies
- 680 Views
-
Last post by original dervish
-
- 19 Replies
- 1827 Views
-
Last post by maria from west side
-
- 1 Replies
- 1090 Views
-
Last post by erigavochick
-
- 0 Replies
- 244 Views
-
Last post by Siciid85